Downtown living has 4x in value since 2000 while the entire Austin-RR MSA has 2x over that same time period
Stay in the Loop
Project Connect Construction Kicks Off in 2027 - Phase 1 of the light rail project will include stops between Bergstrom airport, through Riverside Dr and branches into Downtown, UT campus and South Congress. Train cars expected to be running by 2033.